ITSA/Ferrocement

Photo Gallery

Here is the work crew detailing a Reed SOVA dry rig. It is going to be set up with a 1" hose for thin shell and insulated panel work. Ray McNair has been guiding us through the process to make it preform better than the standard Reed units. I have been hesitant to try dry process because of the dust but Ray assures me that I will have no more dust than I am used to with wet process once I get it dialed in with a predampener.